Ada County Highway District

Ustick Road, Linder Road to Locust Grove Road Projects

General Description:

Project Update as of 9/15/17:  The majority of the concrete for curb, gutter and sidewalk is complete. Crews are working on hand-placements and pedestrian ramps. Concrete paving in the intersection was completed on August 18. Asphalt paving (bottom lift) between Locust Grove and Linder is complete. Asphalt paving (top lift) is scheduled for September 18-22. After paving, remaining work includes concrete sidewalk on the south side, manhole adjustments, permanent striping, landscape repair, and other miscellaneous work

Ustick Road and Meridian Road Construction Video

 

Ustick Road, Linder Road to Locust Grove Road

  • Widen Ustick Road to five lanes with curb, gutter, detached sidewalks and bike lanes
  • Retain existing sidewalk where practical
  • Widen Ustick Road and Meridian Road intersection to include:
    • Dual left turn lanes
    • Right turn lanes
    • Additional thru lanes
  • Install a pedestrian signal on Ustick Road just west of 3rd Street and Settlers Park entrance
  • Evaluate Ustick Road and Venable Lane intersection for a two-way stop, a traffic signal or a roundabout

Project Purpose

  • Improve motorist, pedestrian, and bicyclist safety
  • Accommodate future traffic volumes

Materials from the August 8, 2013 Open House

Materials from the open house can be found on the right side of the screen under "Related Documents".

 

Time Frame

Start Date:
Fall 2016
End Date:
Fall 2017