Camas Street, Orchard Street to Roosevelt Street Pedestrian Project

Project Update as of 9/15/17:  Crews are working on storm drains. The majority of the utility work is complete. the project is behind schedule due to utility delays. 

General Description:

  • Construct curb, gutter and sidewalk on both sides of Camas Street within the public right-of-way to match existing
  • "Reclaim" street (similar to rebuilding street, but less extensive)
  • Replace existing speed humps
  • Retain on-street parking on both sides of the street
  • Move existing crosswalk slightly to west
  • Improve storm drain system and relocate private owner irrigation as needed

Project Purpose

  • Improve pedestrian safety and connectivity 
  • Provide a safe route to school for children walking to local schools

 Construction - June thru September 2017

This summer crews will be rebuilding Camas Street to include a new roadway surface, curb, gutter and sidewalk.

Neighborhood Impacts

  • Camas will be closed to through traffic. However, access to Cassia Park and homes will be maintained.
  • Driveway closures - contractor will coordinate with impacted residents.
  • Equipment back up alarms and ground vibration.
  • General construction noise and dust.
  • Work is expected to occur between 7 a.m. and 7 p.m.

Stay Informed!

Sign up here to receive email updates during construction or call (208) 387-6147.

Time Frame

Start Date:
June 2017
End Date:
September 2017

We Drive Quality Transportation For All Ada County ~
Anytime...Anywhere

Ada County Highway District © 2017
For Questions or problems with this Web site contact the Webmaster