General Description:

  • Add curb, gutter and sidewalk to match existing.
  • Rebuild roadway.
  • Replace pedestrian ramps.

Project Purpose

  • Improve connectivity and safety for pedestrians.

Project History

This project was first proposed in 2005, but proved to be unpopular with the public at the time (due to some now outdated right-of-way requirements) and was set aside. ACHD began updating the design in 2016 as it has been a long time request of the City of Boise.

Design:
2016 - 2017
Right-of-Way:
2017
Construction:
Late 2018 thru summer 2019

 